Asbestos Removal in Torrance

At Torrance Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Mid-century ranch house with sage-green vertical board-and-batten walls, an orange front door, a low roof with deep eaves, a wide garage door and a curved bed of silver-gray succulents on the lawn
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Entry hall of a split-level house with a half flight of carpeted stairs, a textured ceiling and small tan patches on the ceiling and stair wall, and small white sample bags and a card on the bottom stepLiving room with a popcorn ceiling, plastic sheeting over the walls and doorway, plastic taped over the floor and a portable air machine with a flexible duct at the right

Asbestos testing and surveys

Rule 1403 of the South Coast Air Quality Management District asks for the survey prior to any demolition or renovation. The consultant or technician taking the samples is Cal/OSHA-certified and has EPA Building Inspector training. Their lab report states what was sampled, where and the result.

Popcorn ceiling removal

A popcorn ceiling is only known to hold asbestos once a lab says so. Our first step is the sampling. A positive result means we seal off the room and take the texture down.

Kitchen floor covered in square vinyl tiles with a faded pink and beige pattern, wooden cabinets, a white range and sunlight falling across the floorBedroom wall with a rectangular section cut out around a gray electrical panel, the opening framed in wood studs and edged with plastic sheeting taped at the corners above a plastic-covered floor

Floor tile and mastic removal

Older vinyl tile, sheet vinyl and the adhesive under them may contain asbestos. Rule 1403 counts asbestos-containing floor tile, including asphalt and vinyl tile, as resilient floor covering. We have every layer sampled before any of it is lifted.

Drywall, joint compound and plaster removal

Joint compound, wall texture and plaster may hold asbestos too. The survey reaches the material in wall and ceiling cavities as needed to sample it. We plan the demolition around those results, so a wall does not come apart before anyone knows what is in it.

Attic with silver foil-wrapped round ducts along the rafters, plank flooring, loose insulation at the sides and light from a small vent windowEmpty room with clear plastic sheeting over the walls and windows, a bare wood floor and a light blue-gray portable air machine with a flexible hose

HVAC duct and pipe insulation removal

Your heating contractor and we settle the order of jobs together, with wrapped ducts and pipe insulation tested first. Under Rule 1403, putting in or taking out heating, ventilation and air conditioning systems is renovation.

Renovation and demolition abatement

Remodels that open walls and floors fall under the rule, and so do teardowns. Taking out a load-supporting wall counts as demolition. We file the district notice online and remove the asbestos the samples confirm before the other trades arrive.

Asbestos testing and removal costs

More than 8 in every 10 Torrance homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Torrance, Rancho Palos Verdes and Rolling Hills Estates. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

Sampling by a Cal/OSHA-certified consultant or technician, an accredited lab reading of each sample and one written report. The air test after removal is run by an independent consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The room covered in plastic with air filters running, the texture soaked and scraped into bags, a final cleanup and the haul. Skim coating, new texture and paint are extra.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The work area sealed, tile or sheet vinyl lifted, the black mastic beneath removed where it tested positive, bags hauled out and the room cleaned. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment and air filters, the wall or ceiling material that tested positive removed wet, bagged and hauled, then a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, closet or pipe run, positive wrap or tape removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The positive materials come out before the remodel or demolition crew begins, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quoteSee an example project

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra, and roofing is priced after a roof visit.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Samples and a site visit

We walk the rooms with you and go over what the remodel or teardown will open up. A consultant takes samples where the work will reach, and the lab results tell us which materials need an asbestos plan.

02

Registration and containment

Cal/OSHA’s worker rules count material with more than 1/10th of 1% asbestos by weight, a lower line than the 1 percent the air district uses. Registration with Cal/OSHA starts at 100 square feet or more of asbestos-containing material, and it belongs to the employer whose crew does the work. The work area is sealed before removal begins.

03

Removal, air testing and waste

California’s 1 percent hazardous waste limit for asbestos applies only if the material is in a friable, powdered or finely divided state. Crumbly or powdery waste leaves with a licensed hauler and a manifest. Nonfriable material such as vinyl floor tile sits outside that rule, though other agencies may still restrict it. An independent consultant runs the air test at the end, never our own crew.

Houses built before 1980 and what they hide

Homes from 1950 through 1979 make up nearly 3 in 4 of Torrance’s housing. More than 8 in every 10 were built before 1980, only 7.9 percent are older than 1950, and half were built in or before 1964.

Renters live in 45 percent of Torrance homes, 32 percent are in buildings of five or more units, and nearly 6 in every 10 are one-unit homes. The rule’s small-job carve-outs cover single-unit houses only, so that mix matters.

An older house is a reason to test, not proof of asbestos. A survey is how you learn which ceilings, floors and walls hold it and which do not.

The state demolition-permit copy rule

California law, as South Coast AQMD describes it, asks a demolition permit applicant to give the local building and safety department a copy of the demolition notification sent to the district. The description cites Health and Safety Code 19827.5.

That puts the notice ahead of the permit counter, so a teardown schedule starts with the notice. We file it online and give you the copy for your application. To confirm what applies at your address, ask the district’s asbestos hotline at (909) 396-2336 or the local building department.

Testing a ceiling before new lights

New recessed or track lighting means cutting into the ceiling, and a textured ceiling may be popcorn with asbestos in it. Book the survey before the electrician, not after.

The survey report only records the samples that were taken. It gives the spots tested, the material at each one and what the lab found. It does not clear other work, so a different ceiling or a bigger job needs its own survey.

Please do not take samples yourself or cut into the ceiling before the results are in.

Planning around the district notice

The district wants its notice no later than 10 working days before demolition or renovation starts. Those are working days, not calendar days, so book the survey before you book the remodeler. The fee depends on how much asbestos comes out, which the samples show.

The online filing is ours. In the district’s Rule 1403 Notification Web Application we submit each notice with the notification fee. Skip the fee and the district does not treat the notice as received.

Single-unit homes get two small-job carve-outs, both for renovation. Below the size line, the survey requirement does not apply. That line is less than 100 square feet of surface area of asbestos-containing material removed or stripped, and the notice and training requirements use the same line. A lab report is still how you learn the amount. Demolition never qualifies, and an apartment building, townhouse or condominium is not a residential single unit dwelling.

Serving Torrance, Rancho Palos Verdes and Rolling Hills Estates

We also serve Rancho Palos Verdes and Rolling Hills Estates. Call us for confirmation if your address is outside the area.

Frequently asked questions

Are homeowners exempt from the rule?

Sometimes, but the district does not encourage it. South Coast AQMD points to potential asbestos exposure and/or cross contamination. Rule 1403 sets aside renovation done by an owner-occupant of a residential single-unit dwelling who lives there and does the work personally. That rules out vacant houses, rentals and businesses, and it rules out laborers, friends or family helping. Demolition and condos are not covered, and asbestos waste deposited outside the house stays under the rule.

What should I check before hiring a contractor?

Ask for the Contractors State License Board license number and check it. Asbestos-related work involving 100 square feet or more of asbestos-containing material is off limits to a contractor without the C-22 Asbestos Abatement classification, unless a qualifier passed the asbestos certification exam. The board issues a C-22 only to contractors registered with DOSH, Cal/OSHA’s division, so ask for the Cal/OSHA registration as well.

What adds to the cost?

The amount of material and how easy it is to reach set the price, and the final air test adds to it. The district notification fee is sized by the amount of asbestos removed. An independent consultant does the air test, not our crew.

Does a newer house skip the survey?

No. Rule 1403 sets no build-year cutoff, so a house finished in 1985 gets the same survey as one from 1955 before demolition or renovation. Only samples settle what is in a house, whatever its age.

Does a teardown need a notice if nothing turns up?

Yes. Every demolition needs the district notice, found asbestos or not. Wrecking or taking out a structural member that carries load is demolition, so a bearing wall coming out counts. The small-job carve-outs are for renovation only.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 435-4819

Call (424) 435-4819